1、 Key points for choosing floor stickers


When choosing floor tiles, the primary consideration is the material and environmental friendliness. Common flooring materials include solid wood flooring, composite flooring, bamboo flooring, and cork flooring. Each material has its unique advantages, such as natural and beautiful solid wood flooring, high cost-effectiveness of composite flooring, environmentally friendly and healthy bamboo flooring, and comfortable foot feel of cork flooring. No matter which material is chosen, it should be ensured that the product has relevant green environmental certification to ensure the health of the living environment.


Wallpaper Wallpaper

In addition, when selecting floor tiles, the following points should be noted:


    Check the appearance for color differences, cracks, and other defects.

    Test waterproofing by dripping water on the surface to see if the water droplets have penetrated.

    Verify stain resistance, write with an oil-based pen and wipe off to see if the handwriting is clear.

    Check the wear resistance by scratching the surface with a hard object to see if there are any scratches left.

    Observing the splicing effect, good floor tiles should be embedded with each other after splicing, with small gaps.


2、 Installation Techniques for Floor Stickers


1. Choose the laying time and environment


Floor stickers have high requirements for environmental temperature and humidity, and are generally suitable for construction between 16 ℃ and 30 ℃, with spring and autumn being the most suitable seasons. The best construction time every day is after 2 pm, avoiding noon and evening. Before construction, it is necessary to ensure that the ground is dry and clean. If necessary, a layer of diluted cement slurry can be applied to remove stains.


2. Material preparation and moisture-proof treatment


Floor tile materials should be stored at room temperature for two days before laying, stored in a well ventilated and dry place, and protected with plastic film. The damp floor cannot be used and needs to be treated with moisture-proof measures, such as applying a layer of moisture-proof protective paint on the back of the floor.


3. Ground treatment and cushion laying


The ground must be thoroughly cleaned and treated with waterproof and moisture-proof measures, especially in spaces near the kitchen and bathroom. The selection and laying of floor mats are equally important. It is necessary to choose the appropriate type of floor mat and ensure that it is laid flat and firmly adhered to avoid hollowing.


4. Laying method and details


When laying floor tiles, expansion joints should be reserved, and a gap of about 1cm should be left between the floor and the wall. Solid wood composite flooring often adopts suspended paving, such as 369 paving method or half paving method, depending on the actual situation of the room. When applying glue, attention should be paid to the glue method and thickness to ensure that the floor is firmly attached and not easily deformed.


3、 Maintenance Techniques for Floor Stickers


1. Initial protection


After the floor is laid, it needs to be covered with paper or cloth to prevent foreign objects or paint from falling onto the floor during decoration construction. Within 48 hours after laying the floor, avoid frequent walking and placing heavy objects on the floor, let the floor air dry naturally, and ensure that the glue is fully cured.


2. Daily cleaning


It is best to clean the newly laid floor with a vacuum cleaner or broom to keep it dry. During daily cleaning, use a wrung out cotton mop to mop the floor and avoid using damp cloth to prevent the floor from becoming damp and deformed.


3. Regular maintenance


It is recommended to perform the first waxing within one to two months after floor tiling to protect the surface of the floor and extend its service life. Afterwards, according to the usage of the floor, waxing maintenance can be carried out every six months or one year.